Construction Calendar
Tender and Contracts
Jobs
Health & Safety
Cooling Pond
Coke Oven Brook (CO1)
Tar Cell Solidification/Stabilization (CO2)
Cutoff Walls (CO5)
Surface Cap (CO6)
Collection System (CO7) / Water Treatment Plant (CO8)
Landfill (CO9)
Materials Processing Facility (TP2)
Tar Ponds Solidification/Stabilization, Channel Construction (TP6)
Tar Ponds Cap (TP7)
Business Directory
Local Economic Benefits (LEB)
Tendering Schedule
Project Environmental Protection Plan (EPP)
Environmental Management Plan (EMP)
 
 Solidification/Stabilization/Channel (TP6B STPA2008S-23)  
 

As solidification and stabilization (SS) work is carried out in the north and south ponds, a channel will be construction through the middle of the site. Once SS work is complete and the pumps are shut off, the channel will accept the flow from Wash Brook and Coke Ovens Brook. The channel will run from the south pond at Prince Street, all the way to the mouth of Sydney Harbour.

TP6B 100% Design

TP6B Plain Language Report

Interested Bidders List

Pre-bid attendance list

Additional Information

North Tar Pond Pilot ScaleWork Plan

South Tar Pond Pilot ScaleWork Plan

Eng. Des., Phase II Final Report-Acres- Sept 84

Muggah Creek Collector Sewer- Erosion and Sediment Control
Phase III - Environmental Site Assessment - Former CN Rail
Engineering Design Phase 2 Final Report
Geotechnical Investigation Muggah Creek Collector Sewer
CBCL Supplementary Geotechnical Investigation
JW Letter Report Geotechnical Inv

PCB Contamination Interim Report '92

GeoInvRpt Revision 1 July 20 2007

Shoreline Investigation Feb 1989

Shoreline Investigation 1990

HydroGeological Assessement 1990

STPA Sampling Program 1988

Geotechnical Investigation 1984

PCB Delineation May 1996

Phase 1 Final Report 1984


Addendums

Attention all bidders for TP6B STPAS-23. Below you will find Addendums and associated documents. The official addendum has been mailed to the official bidders along with the drawings and supporting documentation.

Addendum 001

Addendum002

Addendum 003

Addendum 004

Addendum 005

Addendum 006


Response To Contractors Queries/Clarifications

Q/A 1

Q/A 2

Q/A 3

Q/A 4

Q/A 5


Q/A 6

pic1 pic2 pic3 pic4 pic5 pic6 pic7 pic8


Q/A 7

Q/A 8

Q/A 9

Q/A 10

Q/A11

Q/A12

Q/A13

Q/A14

Q/A15

Q/A16

Q/A17

Q/A18

Q/A19

Q/A20

Q/A21

Q/A22

Q/A23

Q/A24

Q/A25

Q/A26

Q/A27

Q/A28

Q/A29

Q/A30

Q/A31

Q/A32

Q/A33

Q/A34

Q/A35

Q/A36

Q/A37

Q/A38

Q/A39

Q/A40

Q/A41

Q/A42

Q/A43

Q/A44

Q/A45

Q/A46

Q/A47

Q/A48

Q/A49

Q/A50

Q/A51

Q/A52

Q/A53




 

Live Cams

Bulletin Board

Tender Issued for Protective Cap
July 20, 2010 - The Sydney Tar Ponds Agency has released a tender for the construction of a protective cap over treated tar ponds sediment.It's the third step in a series of projects leading to the future development of the remediated site.Construction of the multi-layer protective cap will begin in the fall, and is scheduled for completion in summer, 2013. It will include a grading/bedding layer, a geosynthetic clay layer, a geocomposit drainage layer, protective fill, topsoil and hydro seed. The cap is designed to direct rain and groundwater into an engineered channel that will also carry brook water to the mouth of Sydney Harbour. The tender closes Aug. 10. More than 70 per cent of the south pond, located between Prince Street and the Ferry Street Bridge, has been solidified and stabilized. Treatment of the entire pond is expected to be completed in August. It will be followed by the construction of a channel to allow brook water and groundwater to flow through the site and into the harbour. In January 2007, the government of Canada and province of Nova Scotia committed $400 million to ensure the Tar Ponds and Coke Ovens cleanup is completed by 2014.

S&S Work Restarts In South Pond

03/23/10 The Sydney Tar Ponds Agency is pleased to announce that the cleanup has kicked into high gear with the restart of solidification and stabilization in the south tar pond.

Contractors began the cement work today (Tuesday, March 23, 2010). The process includes using an excavator to mix cement powder into the contaminated sediment, similar to the way a baker mixes ingredients when making a cake. The contract requires that each completed cell meets established criteria for permeability, leachability, and strength. For more on this contract, please click here.

It's expected that the south pond (from Prince Street to Ferry Street Bridge) will be completely solidified and stabilized by the end of summer, 2010.

Air monitors are operating in real-time at the project fence line, and also operating within the work site as part of the Master Occupational Health and Safety Plan for the project. To receive daily air monitoring reports, please click here.

To view a video clip of work from 2009, please right click here and select save target as. You must download the file in order to view it properly.