Construction Calendar
Tender and Contracts
Jobs
Health & Safety
Cooling Pond
Coke Oven Brook (CO1)
Tar Cell Solidification/Stabilization (CO2)
Cutoff Walls (CO5)
Surface Cap (CO6)
Collection System (CO7) / Water Treatment Plant (CO8)
Landfill (CO9)
Materials Processing Facility (TP2)
Tar Ponds Solidification/Stabilization, Channel Construction (TP6)
Tar Ponds Cap (TP7)
Business Directory
Local Economic Benefits (LEB)
Tendering Schedule
Project Environmental Protection Plan (EPP)
Environmental Management Plan (EMP)
 
 Energy/Fuel Suppliers 
 

AIC , AIC Sullivan's
AIC & Aic Sullivan's is an envirosystems company. providing mega vac,reg vacuum truck services. High pressure wash,Hydrotrenching, Pipe cleaning / cctv video pipe inspection service.
(902) 564-5493 xN/A
675 Keltic Dr,, Sydney


Bluewave Energy
Energy/Fuel Supplies
(902) 562-6464
1301 Victoria Road, Sydney


Co-op Fuels Sydney
Co-op Fuels Sydney has been in business for over 40 years serving the Cape Breton area.
(902) 562-3163
503 Prince St., Sydney

East Coast Savers
Reduce Harmful "Greenhouse Emissions" in any Combustion Engine with 100% Organic Product which conditions Engines to burn fuels more efficiently, 99.5% to be exact, reducing emissions by 50-70%. EPA registered , used in over 60 Countries presently.
(902) 539-3003
5808 Hwy 327, French Road


Irving Oil Marketing Limited
Residential, Commercial Energy Services. Fuel delivery
(902) 567-3054
820 Kings Road, Sydney

Mercer Fuels Limited
Fuel Oil Distributor
(902) 539-4242
64 Brookland St, Sydney


Muin Fuels
Supplier of oil, gas, diesel and lubes
(902) 379-2887
202 Castle Bay Road, P.O. Box 7455, Eskasoni


SCOTIA PROPANE
PROPANE GAS SUPPLY. RESIDENTIAL,COMMERCIAL&INDUSTRIAL PROPANE DELIVERY. COMPLETE PROPANE SYSTEM INSTALLATION & REPAIR
(902) 539-5474
452 GEORGE ST., SYDNEY


Sydco Fuels
Energy/Fuel Supplies
(902) 539-6444
452 George Street, Sydney



 

Live Cams

Bulletin Board

Tender Issued for Protective Cap
July 20, 2010 - The Sydney Tar Ponds Agency has released a tender for the construction of a protective cap over treated tar ponds sediment.It's the third step in a series of projects leading to the future development of the remediated site.Construction of the multi-layer protective cap will begin in the fall, and is scheduled for completion in summer, 2013. It will include a grading/bedding layer, a geosynthetic clay layer, a geocomposit drainage layer, protective fill, topsoil and hydro seed. The cap is designed to direct rain and groundwater into an engineered channel that will also carry brook water to the mouth of Sydney Harbour. The tender closes Aug. 10. More than 70 per cent of the south pond, located between Prince Street and the Ferry Street Bridge, has been solidified and stabilized. Treatment of the entire pond is expected to be completed in August. It will be followed by the construction of a channel to allow brook water and groundwater to flow through the site and into the harbour. In January 2007, the government of Canada and province of Nova Scotia committed $400 million to ensure the Tar Ponds and Coke Ovens cleanup is completed by 2014.

S&S Work Restarts In South Pond

03/23/10 The Sydney Tar Ponds Agency is pleased to announce that the cleanup has kicked into high gear with the restart of solidification and stabilization in the south tar pond.

Contractors began the cement work today (Tuesday, March 23, 2010). The process includes using an excavator to mix cement powder into the contaminated sediment, similar to the way a baker mixes ingredients when making a cake. The contract requires that each completed cell meets established criteria for permeability, leachability, and strength. For more on this contract, please click here.

It's expected that the south pond (from Prince Street to Ferry Street Bridge) will be completely solidified and stabilized by the end of summer, 2010.

Air monitors are operating in real-time at the project fence line, and also operating within the work site as part of the Master Occupational Health and Safety Plan for the project. To receive daily air monitoring reports, please click here.

To view a video clip of work from 2009, please right click here and select save target as. You must download the file in order to view it properly.