|
|
| | ADM Solutions ADM Solutions delivers services to Digitize and discover the untapped wisdom that lies within video, audio, image and text files. (902) 567-3696 29 Park Street, Dominion
Aliant
(902) 563-3019 56 Pitt St, Sydney
Alliance Computer Systems Full service computer dealer. Serving Cape Breton for over 20 years, with quality computer products, software licensing, networking, supplies, and services. Sales and service authorized by IBM, HP/Compaq, Lenovo, AOpen. A+ Certified technicians. (902) 562-6600 134 Welton Street, Sydney
Grant Thornton Grant Thornton has been providing audit, accounting and business advisory services for almost 70 years. From our maritime roots we have grown to one of the largest accounting and consulting firms in the country. (902) 562-5581 500 George Street, Sydney
Hestia Solutions Inc. Hestia Solutions is a provider of online drawing review and approval systems. The company's initial offering, Approve Your Plan, is targeted primarily to architects and associated professions. A more generic release with additional features will soon be available. Hestia Solutions develops innovative internet based applications designed to increase business productivity by decreasing project life cycle times. (902)-564-2100 500 Kings Road Suite 106 Sydney, NS B1S 1B1
MediaSpark MediaSpark helps people and organizations achieve success through the effective use of design and technology. We offer products and services to meet the needs of business, education, government, community organizations, and more. (902) 562-0042 55 Townsend Street, 2nd Floor, Sydney
Nova Communications Telecommunications (902) 564-4047 102 Reeves Street, Sydney
SEACOR Environmental Inc. SEACOR Environmental Inc. is a full-service environmental consulting company with 18 offices across Canada including local offices in Halifax and Sydney, Nova Scotia. (902) 564-7911 1 Inglis Street, Sydney
Second Impression Technologies We are a new-media design and consulting company working specifically with small businesses and non-profit groups in Cape Breton. We also have ties to traditional media as the publisher of The Glace Bay Gleaner, a community newspaper in Glace Bay. (902) 842-1552 PO Box 422, Glace Bay

WEBDOCS ICM Inc. Suite 3, 262 Commercial Street North Sydney, NS B2A 1B8 Tel: (902) 241-3065 Fax: (902) 241-3066 Contact: Stewart J. Sommers, President/CEO

| |
|
 |
|
Live Cams
|
|
|
|
Bulletin Board
|
Tender Issued for Protective Cap July 20, 2010 - The Sydney Tar Ponds Agency has released a tender for the construction of a protective cap over treated tar ponds sediment.It's the third step in a series of projects leading to the future development of the remediated site.Construction of the multi-layer protective cap will begin in the fall, and is scheduled for completion in summer, 2013. It will include a grading/bedding layer, a geosynthetic clay layer, a geocomposit drainage layer, protective fill, topsoil and hydro seed. The cap is designed to direct rain and groundwater into an engineered channel that will also carry brook water to the mouth of Sydney Harbour. The tender closes Aug. 10. More than 70 per cent of the south pond, located between Prince Street and the Ferry Street Bridge, has been solidified and stabilized. Treatment of the entire pond is expected to be completed in August. It will be followed by the construction of a channel to allow brook water and groundwater to flow through the site and into the harbour. In January 2007, the government of Canada and province of Nova Scotia committed $400 million to ensure the Tar Ponds and Coke Ovens cleanup is completed by 2014. S&S Work Restarts In South Pond
03/23/10 The Sydney Tar Ponds Agency is pleased to announce that the cleanup has kicked into high gear with the restart of solidification and stabilization in the south tar pond. Contractors began the cement work today (Tuesday, March 23, 2010). The process includes using an excavator to mix cement powder into the contaminated sediment, similar to the way a baker mixes ingredients when making a cake. The contract requires that each completed cell meets established criteria for permeability, leachability, and strength. For more on this contract, please click here. It's expected that the south pond (from Prince Street to Ferry Street Bridge) will be completely solidified and stabilized by the end of summer, 2010. Air monitors are operating in real-time at the project fence line, and also operating within the work site as part of the Master Occupational Health and Safety Plan for the project. To receive daily air monitoring reports, please click here. To view a video clip of work from 2009, please right click here and select save target as. You must download the file in order to view it properly.
|
|
Notifications
|
|
|
 |
|
|