Construction Calendar
Tender and Contracts
Jobs
Health & Safety
Cooling Pond
Coke Oven Brook (CO1)
Tar Cell Solidification/Stabilization (CO2)
Cutoff Walls (CO5)
Surface Cap (CO6)
Collection System (CO7) / Water Treatment Plant (CO8)
Landfill (CO9)
Materials Processing Facility (TP2)
Tar Ponds Solidification/Stabilization, Channel Construction (TP6)
Tar Ponds Cap (TP7)
Business Directory
Local Economic Benefits (LEB)
Tendering Schedule
Project Environmental Protection Plan (EPP)
Environmental Management Plan (EMP)
 
 Instrumentation and Controls 
 

Almar Instrumentation Services Ltd.
Instrumentation supply,installation,calibration,commissioning and start-up.
(902) 787-2065
8408,Route 19,, Port Hood


Atlantic Automation Limited
Installation, checkout and commissioning of instrument process control and hydraulic systems.
(902) 587-2218
Site 3, Comp 4, RR#3, St. Peter's


Atlantic Water Treatment Technologies
Water Treatment services for industrial, commercial & domestic applicat. We provide services & consultation targeting concerns our customers might have. We also are able to provide most of the products which may be needed in treating problem water.
(902) 567-6677
138 Brickyard Road, Albert Bridge


B&N DISTRIBUTORS LTD.
SUPPLY HYDRAULIC / HOSES BOTH METRIC AND STANDARD , HYDRAULIC TUBING, METRIC AND STANDARD IN STEEL & STAINLESS , "WIX" FILTERS FOR HEAVY MOBILE EQUIPMENT AND MARINE , PIPE FITTINGS IN BRASS STAINLESS AND STEEL, WATER PUMPS , COPPER PIPE & FITTING
(902) 625-5111
15 paint street unit 5, port hawkesbury


Baldwin & Francis Electrical Ltd.
Baldwin & Francis have been in business for the past 25 years as a major supplier to CBDC. They are the Cape Breton distributor/repair facility& sales agent for ITT Flygt, one of the largest suppliers of submersible pumps in the world.
(902) 564-5592
55 Harbour Drive, Sydport Ind. Park, Sydney


Island Distributors Ltd
Suppling pipe, valves & fittings, as well as plbg, heating, electrical and waterworks materials to all mechanical, electrical contractors and government institutions.
(902) 564-5481
135 Johnstone, Sydney


Nedco
Distributors of Electrical Products, Controls & Automation, Wire & Cable, Data, Telecom, Lighting and Distribution. Nedco Represents world class lines such as Schneider, Thomas & Betts, Cooper, Canlyte, Hoffman, Sylvania, Burndy, 3M, Leviton, Ipex.
(902) 564-2648
1212 Upper Price Street, Sydney



 

Live Cams

Bulletin Board

Tender Issued for Protective Cap
July 20, 2010 - The Sydney Tar Ponds Agency has released a tender for the construction of a protective cap over treated tar ponds sediment.It's the third step in a series of projects leading to the future development of the remediated site.Construction of the multi-layer protective cap will begin in the fall, and is scheduled for completion in summer, 2013. It will include a grading/bedding layer, a geosynthetic clay layer, a geocomposit drainage layer, protective fill, topsoil and hydro seed. The cap is designed to direct rain and groundwater into an engineered channel that will also carry brook water to the mouth of Sydney Harbour. The tender closes Aug. 10. More than 70 per cent of the south pond, located between Prince Street and the Ferry Street Bridge, has been solidified and stabilized. Treatment of the entire pond is expected to be completed in August. It will be followed by the construction of a channel to allow brook water and groundwater to flow through the site and into the harbour. In January 2007, the government of Canada and province of Nova Scotia committed $400 million to ensure the Tar Ponds and Coke Ovens cleanup is completed by 2014.

S&S Work Restarts In South Pond

03/23/10 The Sydney Tar Ponds Agency is pleased to announce that the cleanup has kicked into high gear with the restart of solidification and stabilization in the south tar pond.

Contractors began the cement work today (Tuesday, March 23, 2010). The process includes using an excavator to mix cement powder into the contaminated sediment, similar to the way a baker mixes ingredients when making a cake. The contract requires that each completed cell meets established criteria for permeability, leachability, and strength. For more on this contract, please click here.

It's expected that the south pond (from Prince Street to Ferry Street Bridge) will be completely solidified and stabilized by the end of summer, 2010.

Air monitors are operating in real-time at the project fence line, and also operating within the work site as part of the Master Occupational Health and Safety Plan for the project. To receive daily air monitoring reports, please click here.

To view a video clip of work from 2009, please right click here and select save target as. You must download the file in order to view it properly.


Notifications