Construction Calendar
Tender and Contracts
Jobs
Health & Safety
Cooling Pond
Coke Oven Brook (CO1)
Tar Cell Solidification/Stabilization (CO2)
Cutoff Walls (CO5)
Surface Cap (CO6)
Collection System (CO7) / Water Treatment Plant (CO8)
Landfill (CO9)
Materials Processing Facility (TP2)
Tar Ponds Solidification/Stabilization, Channel Construction (TP6)
Tar Ponds Cap (TP7)
Business Directory
Local Economic Benefits (LEB)
Tendering Schedule
Project Environmental Protection Plan (EPP)
Environmental Management Plan (EMP)
 
 Security Equipment and Services 
 

A to Z Point of Sales Systems
We are a Sydney-based company that specializes in the sales and service of cash registers and POS Systems. We also sell and service DVR CCTV Systems. Our company also sells paper and supplies for cash registers and debit machines.
(902) 565-1639
55 Old Kings Rd, Sydney


Direct Traffic Control
Direct Traffic Control is a full service supplier of Traffic Control and Signage required for the safe and efficient flow of traffic during construction or moving of equipment. We also supply rental of flashing arrow boards and other traffic signage
(902) 564-8402
PO Box 721 Station A, Sydney


Eastern Fence Erectors
We supply and install all types of fence and guardrail.
(902) 562-0190
934 Keltic Dr, Sydney


First Strike Security & Investigations Ltd.
Providing all aspects of security and investigations throughout the Cape Breton area. Private guards, private investigators, corporate security, loss prevention available 24 hours a day, 7 days a week. All employees are bonded.
(902) 539-9991 x9991
2145 Kings Road, Sydney


Guardian Alarm & Security
Guardian Alarms & Security has been established since 1979. We supply, install and service alarm, cctv, access control, intercom, fire, tele-communication, audio/visual & catv systems as well as many other low voltage systems
(902) 564-9408
484 Grand Lake Road, Sydney


HarbourTech Services Inc
HarbourTech is locally owned and operated with it's main office located in Harbourside Commercial Park. We provide a wide range of construction services such as Project Management, Heavy Equipment, Trades & Technical Personnel, Labour.
(902) 564-5189
1 Inglis St, Sydney


Maritect Investigations & Security Ltd
Maritect is a full service security and investigations company with a reputation for delivering competitively-priced, professional security solutions for a broad range of clients, from large organizations to individual households.
(902) 564-9517 x224
134 Charlotte Street, Sydney


SecurPro Investigations
Offer unfiromed security as well as private investigation.
(902) 794-1177
235 Mapleview drive, North Sydney



 

Live Cams

Bulletin Board

Tender Issued for Protective Cap
July 20, 2010 - The Sydney Tar Ponds Agency has released a tender for the construction of a protective cap over treated tar ponds sediment.It's the third step in a series of projects leading to the future development of the remediated site.Construction of the multi-layer protective cap will begin in the fall, and is scheduled for completion in summer, 2013. It will include a grading/bedding layer, a geosynthetic clay layer, a geocomposit drainage layer, protective fill, topsoil and hydro seed. The cap is designed to direct rain and groundwater into an engineered channel that will also carry brook water to the mouth of Sydney Harbour. The tender closes Aug. 10. More than 70 per cent of the south pond, located between Prince Street and the Ferry Street Bridge, has been solidified and stabilized. Treatment of the entire pond is expected to be completed in August. It will be followed by the construction of a channel to allow brook water and groundwater to flow through the site and into the harbour. In January 2007, the government of Canada and province of Nova Scotia committed $400 million to ensure the Tar Ponds and Coke Ovens cleanup is completed by 2014.

S&S Work Restarts In South Pond

03/23/10 The Sydney Tar Ponds Agency is pleased to announce that the cleanup has kicked into high gear with the restart of solidification and stabilization in the south tar pond.

Contractors began the cement work today (Tuesday, March 23, 2010). The process includes using an excavator to mix cement powder into the contaminated sediment, similar to the way a baker mixes ingredients when making a cake. The contract requires that each completed cell meets established criteria for permeability, leachability, and strength. For more on this contract, please click here.

It's expected that the south pond (from Prince Street to Ferry Street Bridge) will be completely solidified and stabilized by the end of summer, 2010.

Air monitors are operating in real-time at the project fence line, and also operating within the work site as part of the Master Occupational Health and Safety Plan for the project. To receive daily air monitoring reports, please click here.

To view a video clip of work from 2009, please right click here and select save target as. You must download the file in order to view it properly.


Notifications